Municipal Enterprise “Municipal Company for Waste Management” of the Kharkiv city council
ME "MWMC" KCC

Select your language

 
MEDIA ABOUT US

Video reports, interviews and media publications

Media About Us
What will be done with the remains of destroyed buildings (Video) 10.01.2026

What will be done with the remains of destroyed buildings (Video)

Initial samples of paving slabs were obtained in Kharkiv, where building debris was used instead of the main raw materials...

Go to source
100,000 tons of destruction: why Kharkiv collects the remains of completely destroyed buildings (Video) 03.12.2025

100,000 tons of destruction: why Kharkiv collects the remains of completely destroyed buildings (Video)

Buildings that cannot be restored, but can be useful to the community, go for recycling...

Go to source
A Kharkiv enterprise signed an agreement with UNICEF 20.11.2024

A Kharkiv enterprise signed an agreement with UNICEF

UNICEF will finance the completion of the construction of a landfill in Kharkiv...

Go to source
An enterprise will soon be launched in the Kharkiv region: details 18.03.2024

An enterprise will soon be launched in the Kharkiv region: details

The Kharkiv region demonstrates a positive example of working on the transition to a modern, European waste management system...

Go to source
A waste processing plant near Kharkiv is 97% built 18.03.2024

A waste processing plant near Kharkiv is 97% built

Effective waste management in Kharkiv is an indicator not only of environmental awareness, but also of readiness for crisis situations...

Go to source
The landfill in the suburbs of Kharkiv is being completed 18.03.2024

The landfill in the suburbs of Kharkiv is being completed

The building of the future plant is almost 97% complete. The facilities will allow for deep sorting...

Go to source
Under construction for over 10 years: when will the waste processing plant in Derhachi be launched 16.03.2024

Under construction for over 10 years: when will the waste processing plant in Derhachi be launched

The plant's capacity will create 152 new jobs and process 250,000 tons of waste per year...

Go to source
The Ministry of Environment allocates 4 billion for waste reform, and the Cabinet of Ministers approved the requirements for waste incinerators: all details 01.03.2024

The Ministry of Environment allocates 4 billion for waste reform, and the Cabinet of Ministers approved the requirements for waste incinerators: all details

The use of modern technologies and strict emission control will help ensure efficiency and safety...

Go to source
We do care! A container for collecting hazardous waste was installed near NTU KhPI 11.11.2023

We do care! A container for collecting hazardous waste was installed near NTU "KhPI"

As they decompose, batteries can release hazardous chemicals, which can lead to soil pollution...

Go to source
Where in Kharkiv can you throw away batteries and mercury thermometers (addresses) 09.11.2023

Where in Kharkiv can you throw away batteries and mercury thermometers (addresses)

Garbage containers continue to be installed in Kharkiv, where you can throw away batteries and mercury thermometers...

Go to source
An ecobus resumes work in Kharkiv to collect hazardous waste 10.08.2023

An ecobus resumes work in Kharkiv to collect hazardous waste

The ecobus will collect hazardous waste on the first and third Wednesday of the month (if necessary - weekly) at eight stationary locations...

Go to source
Sorting and reuse of destruction waste has been set up in Kharkiv 26.01.2023

Sorting and reuse of destruction waste has been set up in Kharkiv

Debris from buildings resulting from enemy shelling will be directed to recycling...

Go to source
A sorting line will be launched at the Derhachi landfill 21.02.2022

A sorting line will be launched at the Derhachi landfill

The sorting line will reduce the amount of waste going to the landfill by 10%...

Go to source
The waste processing plant near Kharkiv is being gradually put into operation 11.10.2021

The waste processing plant near Kharkiv is being gradually put into operation

The multifunctional complex will reduce the amount of waste subject to disposal...

Go to source
There are no such plants in Ukraine: a waste processing complex will soon be launched in Kharkiv 21.09.2021

"There are no such plants in Ukraine": a waste processing complex will soon be launched in Kharkiv

The launch of the sorting line will make it possible to sell paper, plastic, wood and metal on the secondary market...

Go to source
The waste processing complex will solve many environmental issues (photo+video) 20.09.2021

The waste processing complex will solve many environmental issues (photo+video)

The complex is built according to global environmental standards and prevents the penetration of harmful substances into the soil and greenhouse gases into the atmosphere...

Go to source
The first waste processing complex in Ukraine is being opened near Kharkiv 20.09.2021

The first waste processing complex in Ukraine is being opened near Kharkiv

In the city of Derhachi, which is part of the Kharkiv agglomeration, the first waste processing complex in Ukraine is being gradually put into operation...

Go to source
An ecobus for hazardous waste was launched in Kharkiv 05.06.2021

An ecobus for hazardous waste was launched in Kharkiv

About 170 kg of batteries were collected from special containers in Kharkiv in a month...

Go to source
A project to collect hazardous waste was launched in Kharkiv (video) 03.06.2021

A project to collect hazardous waste was launched in Kharkiv (video)

Mercury thermometers and lamps in Kharkiv can be left in containers installed near district administrations...

Go to source
In two months, in August, a waste processing plant will open near Kharkiv 27.05.2021

In two months, in August, a waste processing plant will open near Kharkiv

Project implementation took several years. The most important thing was to choose the technology that would be cost-effective...

Go to source
A waste processing complex will be built in Kharkiv 19.04.2021

A waste processing complex will be built in Kharkiv

As soon as the sorting line is put into operation at the multifunctional waste processing complex, the waste will be divided into fractions...

Go to source
In 2021, the first municipal solid waste processing complex in Ukraine will open - Acting Mayor of Kharkiv 11.03.2021

In 2021, the first municipal solid waste processing complex in Ukraine will open - Acting Mayor of Kharkiv

The heart of the complex will be an industrial zone with a processing plant in compliance with all environmental standards...

Go to source
Construction of a modern waste processing complex continues in Derhachi 11.12.2020

Construction of a modern waste processing complex continues in Derhachi

The project has gathered the best approaches and solutions in waste management from leading cities of the world...

Go to source
Employees of ME Municipal Waste Management Company were awarded in the city council (PHOTO) 25.06.2020

Employees of ME "Municipal Waste Management Company" were awarded in the city council (PHOTO)

There have been many positive changes at the enterprise. In particular, the first waste processing complex in Ukraine is under construction...

Go to source
Municipal solid waste landfill in Derhachi (video) 30.03.2020

Municipal solid waste landfill in Derhachi (video)

One of the largest municipal solid waste landfills in the region will become the most modern complex in Ukraine...

Go to source
Landfill in Derhachi. Latest news 10.02.2020

Landfill in Derhachi. Latest news

The new waste processing plant and landfill near Derhachi is already almost 70% ready...

Go to source
A waste processing complex is being built at the Derhachi MSW landfill (PHOTO) 11.08.2019

A waste processing complex is being built at the Derhachi MSW landfill (PHOTO)

With the introduction of a separate waste collection system, the service life of the new landfill will increase significantly...

Go to source
How a waste processing complex is being built near Kharkiv 10.08.2019

How a waste processing complex is being built near Kharkiv

The project provides for the construction of a new landfill and the reclamation of the existing one. The body of the landfill will be covered with a geomembrane...

Go to source
A waste processing complex is being built at the Derhachi MSW landfill (PHOTO) 07.08.2019

A waste processing complex is being built at the Derhachi MSW landfill (PHOTO)

Half of the new landfill has already been built, and the construction of a number of auxiliary buildings will be completed by October 1...

Go to source
Preparatory work is underway at the Derhachi MSW landfill 24.11.2017

Preparatory work is underway at the Derhachi MSW landfill

Work is underway to prepare the site for the installation of the necessary equipment for the waste processing complex...

Go to source
Construction of a waste processing plant in Derhachi will begin in March 08.02.2017

Construction of a waste processing plant in Derhachi will begin in March

The new complex will operate in a closed cycle. The necessary design and estimate documentation has been approved...

Go to source
A new MSW processing complex will be built in Derhachi 13.01.2017

A new MSW processing complex will be built in Derhachi

In the city of Derhachi (Kharkiv region), it is planned to build a complex for the processing of municipal solid waste...

Go to source
A new site for waste disposal was opened at the Derhachi landfill 17.02.2015

A new site for waste disposal was opened at the Derhachi landfill

All waste taken from Kharkiv will be stored in a new place...

Go to source
The waste processing complex at the Derhachi MSW landfill will meet the European level 18.12.2013

The waste processing complex at the Derhachi MSW landfill will meet the European level

Today's technologies make it possible to process everything that is already under the reclaimed soil...

Go to source